Neskowin Emergency Egress on Hawk Street
The Neskowin Emergency Egress Route is complete and provides a secondary route out of the Neskowin Village when the primary route is unavailable. The finished project removed a tide gate & failing culverts and added two bridges, a large box culvert, improvements to the wayside as well as sheet piles – all within a thousand feet of road. The total project cost from inception to completion is estimated at just over $2.7 million and received funding from over 15 different sources, including funds received from Oregon Lottery through OBDD (Business Oregon). This complex site required a permit package that exceeded 200 pages which was approved by numerous agencies.
Cape Meares Loop Road Project (Road was closed in January 2013, obtained a grant from Federal Lands Access Program to rebuild and reopen the road, construction to begin soon). This project was designed by Western Federal Lands (FHWA) and is currently in construction. The contractor is M.A.DeAtley. Project is expected to be complete October 2023.
Please check out the Cape Meares Project Newsletters page for construction progress.
Big Trout Bridge (Big Trout Road): This project replaces a 3-ton posted bridge and is expected to be constructed in 2024.
Two bridges on the Miami Foley Road: Two culverts on Dry Creek and Crystal Creek will be replaced in 2024 with bridges. The culverts were impacted during the 2015 Emergency declared storm.
Bayocean Road over Dick Creek: A bridge will replace the temporary bridge in 2024. The original culvert was blown out during the 2015 Emergency declared storm.
Fairview Road over Hughey Creek: The existing culvert was removed in the fall of 2022 due to concerns of immediate failure. Use Hwy 6 as a detour route. A replacement culvert is scheduled for construction in late summer 2023.
Emergency Bridge Work: 2021 - 2022 Emergency Bridges